Commissioning: Damaged Capacitor Cell UPS
605
19 November 2025 at 14:45:38
Octavio
Steelwork perparations WWT area icm Alain
591
15 November 2025 at 15:36:11
Marinus
P&ID check WWT on completeness and quality
576
15 November 2025 at 15:10:05
Andrew
Quality of UK-Works WWT not approved and acceptable
577
15 November 2025 at 15:09:18
Andrew
Capacity issue of WWT
578
15 November 2025 at 15:08:44
Andrew
No information in any document for LSH-19146.1 for each reactor.
562
12 November 2025 at 16:12:53
Jacek
tagging apparaat for tagging of equipment and piping
568
12 November 2025 at 16:12:05
Ard
NCr's 5x by PMF
537
11 November 2025 at 17:20:45
Ronald
Coating of all black piping in R19/20/24
515
7 November 2025 at 08:24:39
Martin
Water issue incoming station Enexis
486
28 October 2025 at 08:53:26
Danny
Document with instrument Range setting
482
27 October 2025 at 16:34:05
Octavio
Trechters loopbanden aanpassen aan dustfilters
432
14 October 2025 at 10:07:15
Martin
P&ID update WWT for make it final as it should be
368
30 September 2025 at 06:47:40
Andrew
Firewater - additional generator
302
20 September 2025 at 08:40:35
Ard
Verlichting RCB building wie doet wat
231
16 September 2025 at 05:58:49
Bas
Who can calibrate instruments before installation
249
15 September 2025 at 07:24:05
Octavio
HAZOP op MOD09 (due to Pid and iso differences)
218
11 September 2025 at 12:22:32
Simon
Maintenance switches Syngas (NEN1010)
261
10 September 2025 at 12:39:24
Simon
Steel covers of sump pums incl protection
195
2 September 2025 at 13:10:21
Arjan
PED open items
52
11 August 2025 at 13:15:45
Andrew
- 1Page 1