Site install
Company
Insulation piping to steamboiler
09-03
Alain
Details
Equipment - Installation Heatexchangers
09-04
Alain
Details
Supply and installation Container structures
09-01
Alain
Details
Piping connections to steamboiler
09-03
Alain
Details
Prefab Piping connections between system
09-03
Alain
Details
Cable tray installation
10-05
Wouter
Details
cooling tower Reactors
11-04
Wouter
Details
Interconnectiong piping Reactor Area
11-03
Wouter
Details
Interconnecting piping utilities
11-03
Wouter
Details
electrical connections utilitie area in/outside PU
11-05
Wouter
Details
Cooling water conditioning unit
11-04
Wouter
Details
electrical connections
12-05
Wouter
Details
Chiller support lines
12-03
Wouter
Details
electrical connections
12-05
Wouter
Details
12-Chillers 23/24
12-03
Wouter
Details
electrical connections
12-05
Wouter
Details
12-Chillers OCU
12-03
Wouter
Details
Piping connections
12-04
Wouter
Details
Pumppit piping
13-03
Wouter
Details
Piping to tank 3-4
13-03
Wouter
Details
Tank manifold bund 3
13-03
Wouter
Details
Piping to tank 3-3
13-03
Wouter
Details
Bund 4 E&I connections
13-05
Wouter
Details
Pumps TP3
13-04
Wouter
Details
Tankerloading piping to Pipebridge
15-03
Wouter
Details
IBC storage
16-04
Wouter
Details
Electrical connections
16-05
Wouter
Details
Installation of instruments
16-05
Wouter
Details
Steel supports
16-02
Wouter
Details
Piping installation
17-03
Wouter
Details
distributor container
17-04
Wouter
Details
FBBR containers
17-04
Wouter
Details
Cable installation MV reparation
18-05
Danny
Details
Busbar installation Sub02
18-05
Danny
Details
supply + install of all underground cables utility area
18-05
Danny
Details
Electrical connections metering unit by site contractor
18-05
Wouter
Details
electrical installation, incl instruments
19-05
Hakan
Details
Lights + E-installation in to building and M19
19-05
Hakan
Details
Steelbordesses T80201
20-02
Hakan
Details
Steelbordesses T80301
20-02
Hakan
Details
E&I connections
20-05
Hakan
Details
Steelbordesses T80405
20-02
Hakan
Details
Steelsupport T-posts outside
21-02
Wouter
Details
Carbon collection 19
21-04
Wouter
Details
Carbon collection 18
21-04
Wouter
Details
Carbon conveying 23
21-04
Wouter
Details
Silo's to RcB building
21-04
Wouter
Details
Bordesses R24 side
21-02
Wouter
Details
HOLD - Site: gully's etc
22-01
Henk
Details
HOLD - Site: street lighting
22-01
Henk
Details
Installation of pumps
09-04
Alain
Details
Equipment - Vacuum Breaktank
09-04
Alain
Details
Electrical connections in/outside the PU
09-05
Alain
Details
HOLD: Steelwork installation around reactor
09-02
Alain
Details
Electrical connections
10-05
Wouter
Details
pump skid Reactors
11-04
Wouter
Details
Installation instrumenten
11-05
Wouter
Details
electrical connections Reactor area in/outside PU
11-05
Wouter
Details
Cooling water conditioning unit
11-04
Wouter
Details
pump skid utilities
11-04
Wouter
Details
cooling tower utilities
11-04
Wouter
Details
12-Chillers 17/18/19/20
12-03
Wouter
Details
Piping connections
12-03
Wouter
Details
Chiller support lines
12-03
Wouter
Details
Piping connections
12-04
Wouter
Details
Instruments connections
12-05
Wouter
Details
Chiller support lines
12-03
Wouter
Details
Piping to tank 4-1
13-03
Wouter
Details
Piping to tank 3-2
13-03
Wouter
Details
Piping to tank 3-1
13-03
Wouter
Details
Piping to tank 4-2
13-03
Wouter
Details
Pumppit piping
13-03
Wouter
Details
Bund 3 E&I connections
13-05
Wouter
Details
Pumps TP4
13-04
Wouter
Details
Metering station
15-05
Wouter
Details
Installation of E-tracing Naoh leiding
16-05
Wouter
Details
Skimmed oil collection tank T-110010
16-04
Wouter
Details
Piping interconnecting
16-03
Wouter
Details
Sludge centre SP-xxxxx
17-04
Wouter
Details
electrical connections
17-05
Wouter
Details
clarifier container
17-04
Wouter
Details
Technical container
17-04
Wouter
Details
supply + install of all underground cables reactor area
18-05
Danny
Details
Busbar installation Sub03
18-05
Danny
Details
Electrical connections metering unit by site contractor
18-05
Wouter
Details
Piping & mechanical installation utilities
19-03
Hakan
Details
Chain conveyor
19-04
Hakan
Details
Steelbordesses T80202
20-02
Hakan
Details
Steelbordesses T80302
20-02
Hakan
Details
Mechanical installation
20-04
Hakan
Details
Piping utility connections
20-03
Hakan
Details
Steelbordesses T80408
20-02
Hakan
Details
Electrical connections, incl instruments
21-05
Wouter
Details
Carbon collection 17
21-04
Wouter
Details
Carbon collection 20
21-04
Wouter
Details
Carbon conveying 24
21-04
Wouter
Details
Carbon transport to silo
21-04
Wouter
Details
HOLD - Site: road signage
22-01
Henk
Details
HOLD - Site: Collision protection sitewise / barriers
22-01
Henk
Details
Site: OBAS
22-01
Henk
Details