Site install
Company
Piping connection (field run 1 meter flexible)
04B-03
Hakan
Details
Magnetic Seperation installation
04B-04
Hakan
Details
Slide valves installation on screw conveyors
04B-04
Hakan
Details
Equipment screw installation
04B-04
Hakan
Details
Electrical connections to PU equipment items
04B-05
Hakan
Details
magnetic seperator Valve installation
04B-04
Hakan
Details
magnetic seperator Valve installation
04B-04
Hakan
Details
Piping connection (field run 1 meter flexible)
04B-03
Hakan
Details
Electrical connections to PU equipment items
04B-05
Hakan
Details
Pubpieces installation between screws
04B-04
Hakan
Details
Cable hangers
04B-02
Hakan
Details
Equipment screw installation
04B-04
Hakan
Details
Magnetic Seperation installation
04B-04
Hakan
Details
Pubpieces installation between screws
04B-04
Hakan
Details
diverter valves installation
04B-04
Hakan
Details
magnetic seperator Valve installation
04B-04
Hakan
Details
Equipment screw installation
04B-04
Hakan
Details
Piping/ducting/utility lines
05A-03
Wouter
Details
Gasconnection/vent pipes
05A-03
Wouter
Details
Gasconnection/vent pipes
05A-03
Wouter
Details
E&I connections outside the PU
05A-05
Wouter
Details
E&I connections within the PU till JB
05A-05
Wouter
Details
Gasconnection/vent pipes
05A-03
Wouter
Details
Piping/ducting/utility lines
05A-03
Wouter
Details
Gasconnection/vent pipes
05A-03
Wouter
Details
Piping/ducting/utility lines
05A-03
Wouter
Details
E&I connections outside the PU
05A-05
Wouter
Details
Piping/ducting/utility lines
05A-03
Wouter
Details
Thermal oxidiser inlet piece
05B-03
Wouter
Details
Insulation welding joints
05B-04
Wouter
Details
Gasconnection/vent pipes to TO
05B-03
Wouter
Details
Gasconnection/vent pipes
05B-03
Wouter
Details
E&I connections to TO
05B-05
Wouter
Details
slide valves / inlet connections
06-04
Hakan
Details
A: Electrical connections to PU
06-05
Hakan
Details
B: Connection A to Reactor
06-04
Hakan
Details
Magnetic Seperator
06-04
Hakan
Details
Installation of Instruments
06-05
Hakan
Details
A: Entrance bin
06-04
Hakan
Details
A: Electrical connections to PU
06-05
Hakan
Details
B: Connection B to Reactor
06-04
Hakan
Details
Supporting conveyor
06-02
Hakan
Details
A: Feederline + Vulcanisation
06-04
Hakan
Details
A: Entrance bin
06-04
Hakan
Details
B: Connection B to Reactor
06-04
Hakan
Details
Magnetic Seperator
06-04
Hakan
Details
Vulcanisation of beld 20
06-04
Hakan
Details
B: Connection A to Reactor
06-04
Hakan
Details
A: Feederline + Vulcanisation
06-04
Hakan
Details
A: Electrical connections to PU
06-05
Hakan
Details
Pubpieces installation between screws
04B-04
Hakan
Details
Cable hangers
04B-02
Hakan
Details
diverter valves installation
04B-04
Hakan
Details
Supporting screw hangers 2x
04B-02
Hakan
Details
Supporting screw fixed
04B-02
Hakan
Details
Piping connection (field run 1 meter flexible)
04B-03
Hakan
Details
Magnetic Seperation installation
04B-04
Hakan
Details
Supporting screw fixed
04B-02
Hakan
Details
Slide valves installation on screw conveyors
04B-04
Hakan
Details
Supporting screw hangers 2x
04B-02
Hakan
Details
diverter valves installation
04B-04
Hakan
Details
Supporting screw fixed
04B-02
Hakan
Details
Piping connection (field run 1 meter flexible)
04B-03
Hakan
Details
Supporting screw hangers 2x
04B-02
Hakan
Details
Slide valves installation on screw conveyors
04B-04
Hakan
Details
Cable hangers
04B-02
Hakan
Details
Electrical connections to PU equipment items
04B-05
Hakan
Details
E&I connections within the PU till JB
05A-05
Wouter
Details
E&I connections outside the PU
05A-05
Wouter
Details
Piping/ducting/utility lines
05A-03
Wouter
Details
E&I connections within the PU till JB
05A-05
Wouter
Details
E&I connections within the PU till JB
05A-05
Wouter
Details
E&I connections outside the PU
05A-05
Wouter
Details
E&I connections within the PU till JB
05A-05
Wouter
Details
E&I connections outside the PU
05A-05
Wouter
Details
E&I connections within the PU till JB
05A-05
Wouter
Details
Gasconnection/vent pipes
05A-03
Wouter
Details
E&I connections to TO
05B-05
Wouter
Details
Insulation welding joints
05B-04
Wouter
Details
Insulation welding joints
05B-04
Wouter
Details
E&I connections to TO
05B-05
Wouter
Details
Gasconnection/vent pipes
05B-03
Wouter
Details
Thermal oxidiser inlet piece
05B-03
Wouter
Details
Vulcanisation of beld 17
06-04
Hakan
Details
A: A: Feederline + Vulcanisation
06-04
Hakan
Details
Supporting conveyor
06-02
Hakan
Details
Installation of purge infeed system
06-04
Hakan
Details
B: Connection B to Reactor
06-04
Hakan
Details
B: Connection A to Reactor
06-04
Hakan
Details
Vulcanisation of beld 18
06-04
Hakan
Details
Installation of purge infeed system
06-04
Hakan
Details
slide valves / inlet connections
06-04
Hakan
Details
Magnetic Seperator
06-04
Hakan
Details
Installation of Instruments
06-05
Hakan
Details
Installation of purge infeed system
06-04
Hakan
Details
Supporting conveyor
06-02
Hakan
Details
slide valves / inlet connections
06-04
Hakan
Details
A: Entrance bin
06-04
Hakan
Details
Magnetic Seperator
06-04
Hakan
Details
Supporting conveyor
06-02
Hakan
Details
8