Workpackages
< Back
ALL
Filters:
Owner
Selecteer Owner
Module
Selecteer Module
Line
Selecteer Line
Status
Selecteer Status
Finishweek
Selecteer Finishweek
Site install
Company
Piping Natural Gas line R20
24B-03
Wouter
Details
Piping Natural Gas line R24
24B-03
Wouter
Details
Piping Natural Gas line R18
24B-03
Wouter
Details
Piping N2 line R23
24B-03
Wouter
Details
Connection to tie-in NorthWater and metering unit
24B-03
Wouter
Details
Connection to tie-in GSP and metering unit
24B-03
Wouter
Details
Installation of softener container (4x2) besided OCU
24B-04
Wouter
Details
Electrical connections discharge pumps by site contractor
24B-05
Wouter
Details
Vesseltrim T-110100
24C-03
Hakan
Details
Vesseltrim F-60574
24C-03
Hakan
Details
Vesseltrim T-51581
24C-03
Hakan
Details
Vesseltrim T-50511
24C-03
Hakan
Details
Vesseltrim T-60531
24C-03
Hakan
Details
Vesseltrim T-50510
24C-03
Hakan
Details
Vesseltrim F-60575
24C-03
Hakan
Details
Dust system 18 general
26-04
Hakan
Details
Dust system 20 general
26-04
Hakan
Details
Dust system 19/20
26-04
Hakan
Details
E&I connections (air,power) filters 17
26-05
Hakan
Details
Utilitie connections (air,power) filters 19
26-03
Hakan
Details
Utilitie connections (air,power) filters 17
26-03
Hakan
Details
Utilitie connections (air,power) filters 18
26-03
Hakan
Details
E&I connections (air,power) filters 20
26-05
Hakan
Details
E&I connections (air,power) filters 18
26-05
Hakan
Details
Utilitie connections (air,power) silo 1
26-03
Hakan
Details
Dust filter on silo 01
26-04
Hakan
Details
Utilitie connections (air,power) silo 3
26-03
Hakan
Details
Dust filter on silo 03
26-04
Hakan
Details
Utilitie connections (air,power) silo 4
26-03
Hakan
Details
E&I connections (air,power) silo 3
26-05
Hakan
Details
Intergration of MCC panel into MCC 4-2
27-
Wouter
Details
Installation of instruments
27-
Wouter
Details
Sounders installation at bunds area
30A-
Danny
Details
HOLD - Cleaning facility
31-
Henk
Details
HOLD - utilitity Air connections
31-
Wouter
Details
Dieseltank connections electrical
31-
Danny
Details
Piping Natural Gas line R23
24B-03
Wouter
Details
Installation of external Piping (Groningen Seaports) Air line to EEW (600m)
24B-03
Wouter
Details
Piping Natural Gas line R17
24B-03
Wouter
Details
Gasline - install underground block and bleed
24B-03
Wouter
Details
Installation of metering unit by Northwater
24B-03
Wouter
Details
Installation of metering unit by EEW
24B-03
Wouter
Details
Installation of softener container (4x2) besided OCU
24B-04
Wouter
Details
Connection to tie-in NorthWater (underground collection pond)
24B-03
Wouter
Details
Vesseltrim T-51570
24C-03
Hakan
Details
Vesseltrim T-51580
24C-03
Hakan
Details
Vesseltrim T-60540
24C-03
Hakan
Details
Vesseltrim T-60530
24C-03
Hakan
Details
Vesseltrim T-51521
24C-03
Hakan
Details
Vesseltrim T-51511
24C-03
Hakan
Details
Dust system 17 general
26-04
Hakan
Details
Dust system 19 general
26-04
Hakan
Details
Dust system 17/18
26-04
Hakan
Details
Utilitie connections (air,power) filters 20
26-03
Hakan
Details
E&I connections (air,power) filters 19/20
26-05
Hakan
Details
Utilitie connections (air,power) filters 19/20
26-03
Hakan
Details
Utilitie connections (air,power) filters 17/18
26-03
Hakan
Details
E&I connections (air,power) filters 17/18
26-05
Hakan
Details
E&I connections (air,power) filters 19
26-05
Hakan
Details
Dust filter on silo 04
26-04
Hakan
Details
E&I connections (air,power) silo 2
26-05
Hakan
Details
E&I connections (air,power) silo 4
26-05
Hakan
Details
Utilitie connections (air,power) silo 2
26-03
Hakan
Details
Dust filter on silo 02
26-04
Hakan
Details
E&I connections (air,power) silo 1
26-05
Hakan
Details
Electrical connections outside PU
27-
Wouter
Details
VRU skid electrical connections
27-
Wouter
Details
VRU skid installation
27-
Wouter
Details
Rental genererator FireFighting pumps
30A-
Danny
Details
HOLD - utilitity Sewer connections
31-
Wouter
Details
HOLD - utilitity Water connections
31-
Wouter
Details
8
Pagina 8