Site install
Company
Installation Scrubber 20
02-04
Simon
Details
Installation Seepex pumps
02-04
Simon
Details
Filling the scrubber with internals 20
02-04
Simon
Details
Piping M02
02-03
Simon
Details
Hydrotest piping skid
02-03
Simon
Details
E&I connections to/into PU
02-05
Simon
Details
Installation Scrubber 23
02-04
Simon
Details
Installation Chiller
02-04
Simon
Details
Installation of HeatExchanger
02-04
Wouter
Details
Installation Chiller 2
02-04
Simon
Details
E&I connections to/into PU
02-05
Simon
Details
Installation Seepex pumps
02-04
Simon
Details
Installation of HeatExchanger
02-04
Wouter
Details
Installation Seepex pumps
02-04
Simon
Details
Prefab piping, incl utility piping
02-03
Simon
Details
Installation of instruments
02-05
Simon
Details
Piping M02
02-03
Simon
Details
E&I connections to/into PU
02-05
Simon
Details
Installation Chiller
02-04
Simon
Details
Piping branch connections
03-03
Simon
Details
Piping ISBL package unit
03-04
Simon
Details
Syngas supports 18
03-02
Simon
Details
Civil firewall protection syngas 17-18
03-01
Simon
Details
Adjustments to skid, incl afblaasleidingen by supplier
03-01
Wouter
Details
Piping branch connections
03-03
Wouter
Details
Piping ISBL package unit
03-04
Wouter
Details
Piping branch connections
03-03
Wouter
Details
Piping ISBL package unit
03-04
Wouter
Details
Piping ISBL package unit
03-04
Wouter
Details
Civil firewall protection syngas 23-24
03-01
Wouter
Details
Adjustments to skid, incl afblaasleidingen by supplier
03-01
Wouter
Details
Hydrolic connection installation
04A-03
Wouter
Details
Hydrolic connection installation
04A-03
Wouter
Details
Hydrolic system skid
04A-04
Wouter
Details
Hydrolic system skid
04A-04
Wouter
Details
Hydrolic connection installation
04A-03
Wouter
Details
Hydrolic connection installation
04A-03
Wouter
Details
magnetic seperator Valve installation
04B-04
Hakan
Details
Slide valves installation on screw conveyors
04B-04
Hakan
Details
Cable hangers
04B-02
Hakan
Details
Magnetic Seperation installation
04B-04
Hakan
Details
Pubpieces installation between screws
04B-04
Hakan
Details
Piping connection (field run 1 meter flexible)
04B-03
Hakan
Details
Supporting screw hangers 2x
04B-02
Hakan
Details
Magnetic Seperation installation
04B-04
Hakan
Details
magnetic seperator Valve installation
04B-04
Hakan
Details
Equipment screw installation
04B-04
Hakan
Details
Piping connection (field run 1 meter flexible)
04B-03
Hakan
Details
Pubpieces installation between screws
04B-04
Hakan
Details
Supporting screw fixed
04B-02
Hakan
Details
Installation Flowserve pumps 3x
02-04
Simon
Details
Installation of HeatExchanger
02-04
Wouter
Details
Installation Oil filters 2x
02-04
Simon
Details
Prefab piping, incl utility piping
02-03
Simon
Details
Installation of instruments
02-05
Simon
Details
Prefab piping, incl utility piping
02-03
Simon
Details
Installation Oil filters 2x
02-04
Simon
Details
Installation of instruments
02-05
Simon
Details
Hydrotest piping skid
02-03
Simon
Details
Filling the scrubber with internals 23
02-04
Simon
Details
Installation Flowserve pumps 3x
02-04
Simon
Details
Piping M02
02-03
Simon
Details
Installation Scrubber 24
02-04
Simon
Details
Installation Flowserve pumps 3x
02-04
Simon
Details
Filling the scrubber with internals 24
02-04
Simon
Details
Installation Oil filters 2x
02-04
Simon
Details
Installation Chiller 2
02-04
Simon
Details
Hydrotest piping skid
02-03
Simon
Details
Adjustments to skid, incl afblaasleidingen by supplier
03-02
Simon
Details
Syngas supports 17
03-02
Simon
Details
Piping branch connections
03-03
Simon
Details
Piping ISBL package unit
03-04
Simon
Details
Adjustments to skid, incl afblaasleidingen by supplier
03-01
Simon
Details
Civil firewall protection syngas 19/20
03-01
Wouter
Details
Adjustments to skid, incl afblaasleidingen by supplier
03-01
Simon
Details
Syngas supports 20
03-02
Wouter
Details
Adjustments to skid, incl afblaasleidingen by supplier
03-01
Wouter
Details
Syngas supports 23
03-02
Wouter
Details
Package unit/skid installation
03-04
Wouter
Details
Syngas supports 24
03-02
Wouter
Details
Piping branch connections
03-03
Wouter
Details
Hydrolic system skid
04A-04
Wouter
Details
Hydrolic system skid
04A-04
Wouter
Details
Hydrolic connection installation
04A-03
Wouter
Details
Hydrolic connection installation
04A-03
Wouter
Details
Hydrolic system skid
04A-04
Wouter
Details
Hydrolic system skid
04A-04
Wouter
Details
diverter valves installation
04B-04
Hakan
Details
Equipment screw installation
04B-04
Hakan
Details
Supporting screw fixed
04B-02
Hakan
Details
Supporting screw hangers 2x
04B-02
Hakan
Details
Electrical connections to PU equipment items
04B-05
Hakan
Details
Supporting screw fixed
04B-02
Hakan
Details
diverter valves installation
04B-04
Hakan
Details
Cable hangers
04B-02
Hakan
Details
Electrical connections to PU equipment items
04B-05
Hakan
Details
Slide valves installation on screw conveyors
04B-04
Hakan
Details
Pubpieces installation between screws
04B-04
Hakan
Details
Supporting screw hangers 2x
04B-02
Hakan
Details
diverter valves installation
04B-04
Hakan
Details
8
Pagina 2
bottom of page