top of page
RED Code above
The initial delivery of the flexible hoses is Circtec scope. Pmf received the requist to support the delivery of these hoses. The delivery time of flexible is 6 weeks and critical. not enough details provided by Circtec to order these in time. PMF ordered flexibles with a deliverytime of 2 weeks in consultation with Simon for first oil. After the test the outlining will be checked by Circtec and recieuwd for the remaining MOD02
4 september 2025 om 08:52:51
DJ
bottom of page

